Product Code: IRTNTR43658
Abstract
The data center construction market is forecasted to grow by USD 37.66 bn during 2023-2028, accelerating at a CAGR of 8.75% during the forecast period. The report on the data center construction market provides a holistic analysis, market size and forecast, trends, growth drivers, and challenges, as well as vendor analysis covering around 25 vendors.
The report offers an up-to-date analysis regarding the current market scenario, the latest trends and drivers, and the overall market environment. The market is driven by rising demand for data center colocation facilities, increasing data center investments and data center modernization, and increasing demand for cloud-based services.
Market Scope |
Base Year | 2024 |
End Year | 2028 |
Series Year | 2024-2028 |
Growth Momentum | Accelerate |
YOY 2024 | 8.55% |
CAGR | 8.75% |
Incremental Value | $37.66bn |
Technavio's data center construction market is segmented as below:
By Application
- Enterprise
- Cloud
- Colocation
- Hyperscale
By Type
- Electrical construction
- Mechanical construction
- General construction
By Geographical Landscape
- North America
- Europe
- APAC
- South America
- Middle East and Africa
This study identifies the growing focus on construction of green data centers as one of the prime reasons driving the data center construction market growth during the next few years. Also, growth in investments in hyperscale data centers and increase in M and A activities in data centers will lead to sizable demand in the market.
The report on the data center construction market covers the following areas:
- Data center construction market sizing
- Data center construction market forecast
- Data center construction market industry analysis
The robust vendor analysis is designed to help clients improve their market position, and in line with this, this report provides a detailed analysis of several leading data center construction market vendors that include ABB Ltd., AECOM, AMETEK Inc., Arup Group Ltd., Asetek AS, Clune Construction Co., Delta Electronics Inc., DPR Construction, Eaton Corp. Plc, Emerson Electric Co., FORTIS CONSTRUCTION Inc., Gilbane Inc., HDR Inc., Hensel Phelps, HITT CONTRACTING INC., Iron Mountain Inc., J.E. Dunn Construction Co., Nippon Telegraph And Telephone Corp., SAS Institute Inc., Siemens AG, and Turner Construction Co.. Also, the data center construction market analysis report includes information on upcoming trends and challenges that will influence market growth. This is to help companies strategize and leverage all forthcoming growth opportunities.
The study was conducted using an objective combination of primary and secondary information including inputs from key participants in the industry. The report contains a comprehensive market and vendor landscape in addition to an analysis of the key vendors.
The publisher presents a detailed picture of the market by the way of study, synthesis, and summation of data from multiple sources by an analysis of key parameters such as profit, pricing, competition, and promotions. It presents various market facets by identifying the key industry influencers. The data presented is comprehensive, reliable, and a result of extensive research - both primary and secondary. The market research reports provide a complete competitive landscape and an in-depth vendor selection methodology and analysis using qualitative and quantitative research to forecast the accurate market growth.
Table of Contents
1 Executive Summary
- 1.1 Market overview
- Exhibit 01: Executive Summary - Chart on Market Overview
- Exhibit 02: Executive Summary - Data Table on Market Overview
- Exhibit 03: Executive Summary - Chart on Global Market Characteristics
- Exhibit 04: Executive Summary - Chart on Market By Geographical Landscape
- Exhibit 05: Executive Summary - Chart on Market Segmentation by Application
- Exhibit 06: Executive Summary - Chart on Market Segmentation by Type
- Exhibit 07: Executive Summary - Chart on Incremental Growth
- Exhibit 08: Executive Summary - Data Table on Incremental Growth
- Exhibit 09: Executive Summary - Chart on Vendor Market Positioning
2 Market Landscape
- 2.1 Market ecosystem
- Exhibit 10: Parent market
- Exhibit 11: Market Characteristics
3 Market Sizing
- 3.1 Market definition
- Exhibit 12: Offerings of vendors included in the market definition
- 3.2 Market segment analysis
- Exhibit 13: Market segments
- 3.3 Market size 2023
- 3.4 Market outlook: Forecast for 2023-2028
- Exhibit 14: Chart on Global - Market size and forecast 2023-2028 ($ billion)
- Exhibit 15: Data Table on Global - Market size and forecast 2023-2028 ($ billion)
- Exhibit 16: Chart on Global Market: Year-over-year growth 2023-2028 (%)
- Exhibit 17: Data Table on Global Market: Year-over-year growth 2023-2028 (%)
4 Historic Market Size
- 4.1 Global data center construction market 2018 - 2022
- Exhibit 18: Historic Market Size - Data Table on global data center construction market 2018 - 2022 ($ billion)
- 4.2 Application Segment Analysis 2018 - 2022
- Exhibit 19: Historic Market Size - Application Segment 2018 - 2022 ($ billion)
- 4.3 Type Segment Analysis 2018 - 2022
- Exhibit 20: Historic Market Size - Type Segment 2018 - 2022 ($ billion)
- 4.4 Geography Segment Analysis 2018 - 2022
- Exhibit 21: Historic Market Size - Geography Segment 2018 - 2022 ($ billion)
- 4.5 Country Segment Analysis 2018 - 2022
- Exhibit 22: Historic Market Size - Country Segment 2018 - 2022 ($ billion)
5 Five Forces Analysis
- 5.1 Five forces summary
- Exhibit 23: Five forces analysis - Comparison between 2023 and 2028
- 5.2 Bargaining power of buyers
- Exhibit 24: Chart on Bargaining power of buyers - Impact of key factors 2023 and 2028
- 5.3 Bargaining power of suppliers
- Exhibit 25: Bargaining power of suppliers - Impact of key factors in 2023 and 2028
- 5.4 Threat of new entrants
- Exhibit 26: Threat of new entrants - Impact of key factors in 2023 and 2028
- 5.5 Threat of substitutes
- Exhibit 27: Threat of substitutes - Impact of key factors in 2023 and 2028
- 5.6 Threat of rivalry
- Exhibit 28: Threat of rivalry - Impact of key factors in 2023 and 2028
- 5.7 Market condition
- Exhibit 29: Chart on Market condition - Five forces 2023 and 2028
6 Market Segmentation by Application
- 6.1 Market segments
- Exhibit 30: Chart on Application - Market share 2023-2028 (%)
- Exhibit 31: Data Table on Application - Market share 2023-2028 (%)
- 6.2 Comparison by Application
- Exhibit 32: Chart on Comparison by Application
- Exhibit 33: Data Table on Comparison by Application
- 6.3 Enterprise - Market size and forecast 2023-2028
- Exhibit 34: Chart on Enterprise - Market size and forecast 2023-2028 ($ billion)
- Exhibit 35: Data Table on Enterprise - Market size and forecast 2023-2028 ($ billion)
- Exhibit 36: Chart on Enterprise - Year-over-year growth 2023-2028 (%)
- Exhibit 37: Data Table on Enterprise - Year-over-year growth 2023-2028 (%)
- 6.4 Cloud - Market size and forecast 2023-2028
- Exhibit 38: Chart on Cloud - Market size and forecast 2023-2028 ($ billion)
- Exhibit 39: Data Table on Cloud - Market size and forecast 2023-2028 ($ billion)
- Exhibit 40: Chart on Cloud - Year-over-year growth 2023-2028 (%)
- Exhibit 41: Data Table on Cloud - Year-over-year growth 2023-2028 (%)
- 6.5 Colocation - Market size and forecast 2023-2028
- Exhibit 42: Chart on Colocation - Market size and forecast 2023-2028 ($ billion)
- Exhibit 43: Data Table on Colocation - Market size and forecast 2023-2028 ($ billion)
- Exhibit 44: Chart on Colocation - Year-over-year growth 2023-2028 (%)
- Exhibit 45: Data Table on Colocation - Year-over-year growth 2023-2028 (%)
- 6.6 Hyperscale - Market size and forecast 2023-2028
- Exhibit 46: Chart on Hyperscale - Market size and forecast 2023-2028 ($ billion)
- Exhibit 47: Data Table on Hyperscale - Market size and forecast 2023-2028 ($ billion)
- Exhibit 48: Chart on Hyperscale - Year-over-year growth 2023-2028 (%)
- Exhibit 49: Data Table on Hyperscale - Year-over-year growth 2023-2028 (%)
- 6.7 Market opportunity by Application
- Exhibit 50: Market opportunity by Application ($ billion)
- Exhibit 51: Data Table on Market opportunity by Application ($ billion)
7 Market Segmentation by Type
- 7.1 Market segments
- Exhibit 52: Chart on Type - Market share 2023-2028 (%)
- Exhibit 53: Data Table on Type - Market share 2023-2028 (%)
- 7.2 Comparison by Type
- Exhibit 54: Chart on Comparison by Type
- Exhibit 55: Data Table on Comparison by Type
- 7.3 Electrical construction - Market size and forecast 2023-2028
- Exhibit 56: Chart on Electrical construction - Market size and forecast 2023-2028 ($ billion)
- Exhibit 57: Data Table on Electrical construction - Market size and forecast 2023-2028 ($ billion)
- Exhibit 58: Chart on Electrical construction - Year-over-year growth 2023-2028 (%)
- Exhibit 59: Data Table on Electrical construction - Year-over-year growth 2023-2028 (%)
- 7.4 Mechanical construction - Market size and forecast 2023-2028
- Exhibit 60: Chart on Mechanical construction - Market size and forecast 2023-2028 ($ billion)
- Exhibit 61: Data Table on Mechanical construction - Market size and forecast 2023-2028 ($ billion)
- Exhibit 62: Chart on Mechanical construction - Year-over-year growth 2023-2028 (%)
- Exhibit 63: Data Table on Mechanical construction - Year-over-year growth 2023-2028 (%)
- 7.5 General construction - Market size and forecast 2023-2028
- Exhibit 64: Chart on General construction - Market size and forecast 2023-2028 ($ billion)
- Exhibit 65: Data Table on General construction - Market size and forecast 2023-2028 ($ billion)
- Exhibit 66: Chart on General construction - Year-over-year growth 2023-2028 (%)
- Exhibit 67: Data Table on General construction - Year-over-year growth 2023-2028 (%)
- 7.6 Market opportunity by Type
- Exhibit 68: Market opportunity by Type ($ billion)
- Exhibit 69: Data Table on Market opportunity by Type ($ billion)
8 Customer Landscape
- 8.1 Customer landscape overview
- Exhibit 70: Analysis of price sensitivity, lifecycle, customer purchase basket, adoption rates, and purchase criteria
9 Geographic Landscape
- 9.1 Geographic segmentation
- Exhibit 71: Chart on Market share By Geographical Landscape 2023-2028 (%)
- Exhibit 72: Data Table on Market share By Geographical Landscape 2023-2028 (%)
- 9.2 Geographic comparison
- Exhibit 73: Chart on Geographic comparison
- Exhibit 74: Data Table on Geographic comparison
- 9.3 North America - Market size and forecast 2023-2028
- Exhibit 75: Chart on North America - Market size and forecast 2023-2028 ($ billion)
- Exhibit 76: Data Table on North America - Market size and forecast 2023-2028 ($ billion)
- Exhibit 77: Chart on North America - Year-over-year growth 2023-2028 (%)
- Exhibit 78: Data Table on North America - Year-over-year growth 2023-2028 (%)
- 9.4 Europe - Market size and forecast 2023-2028
- Exhibit 79: Chart on Europe - Market size and forecast 2023-2028 ($ billion)
- Exhibit 80: Data Table on Europe - Market size and forecast 2023-2028 ($ billion)
- Exhibit 81: Chart on Europe - Year-over-year growth 2023-2028 (%)
- Exhibit 82: Data Table on Europe - Year-over-year growth 2023-2028 (%)
- 9.5 APAC - Market size and forecast 2023-2028
- Exhibit 83: Chart on APAC - Market size and forecast 2023-2028 ($ billion)
- Exhibit 84: Data Table on APAC - Market size and forecast 2023-2028 ($ billion)
- Exhibit 85: Chart on APAC - Year-over-year growth 2023-2028 (%)
- Exhibit 86: Data Table on APAC - Year-over-year growth 2023-2028 (%)
- 9.6 South America - Market size and forecast 2023-2028
- Exhibit 87: Chart on South America - Market size and forecast 2023-2028 ($ billion)
- Exhibit 88: Data Table on South America - Market size and forecast 2023-2028 ($ billion)
- Exhibit 89: Chart on South America - Year-over-year growth 2023-2028 (%)
- Exhibit 90: Data Table on South America - Year-over-year growth 2023-2028 (%)
- 9.7 Middle East and Africa - Market size and forecast 2023-2028
- Exhibit 91: Chart on Middle East and Africa - Market size and forecast 2023-2028 ($ billion)
- Exhibit 92: Data Table on Middle East and Africa - Market size and forecast 2023-2028 ($ billion)
- Exhibit 93: Chart on Middle East and Africa - Year-over-year growth 2023-2028 (%)
- Exhibit 94: Data Table on Middle East and Africa - Year-over-year growth 2023-2028 (%)
- 9.8 US - Market size and forecast 2023-2028
- Exhibit 95: Chart on US - Market size and forecast 2023-2028 ($ billion)
- Exhibit 96: Data Table on US - Market size and forecast 2023-2028 ($ billion)
- Exhibit 97: Chart on US - Year-over-year growth 2023-2028 (%)
- Exhibit 98: Data Table on US - Year-over-year growth 2023-2028 (%)
- 9.9 UK - Market size and forecast 2023-2028
- Exhibit 99: Chart on UK - Market size and forecast 2023-2028 ($ billion)
- Exhibit 100: Data Table on UK - Market size and forecast 2023-2028 ($ billion)
- Exhibit 101: Chart on UK - Year-over-year growth 2023-2028 (%)
- Exhibit 102: Data Table on UK - Year-over-year growth 2023-2028 (%)
- 9.10 China - Market size and forecast 2023-2028
- Exhibit 103: Chart on China - Market size and forecast 2023-2028 ($ billion)
- Exhibit 104: Data Table on China - Market size and forecast 2023-2028 ($ billion)
- Exhibit 105: Chart on China - Year-over-year growth 2023-2028 (%)
- Exhibit 106: Data Table on China - Year-over-year growth 2023-2028 (%)
- 9.11 Germany - Market size and forecast 2023-2028
- Exhibit 107: Chart on Germany - Market size and forecast 2023-2028 ($ billion)
- Exhibit 108: Data Table on Germany - Market size and forecast 2023-2028 ($ billion)
- Exhibit 109: Chart on Germany - Year-over-year growth 2023-2028 (%)
- Exhibit 110: Data Table on Germany - Year-over-year growth 2023-2028 (%)
- 9.12 Japan - Market size and forecast 2023-2028
- Exhibit 111: Chart on Japan - Market size and forecast 2023-2028 ($ billion)
- Exhibit 112: Data Table on Japan - Market size and forecast 2023-2028 ($ billion)
- Exhibit 113: Chart on Japan - Year-over-year growth 2023-2028 (%)
- Exhibit 114: Data Table on Japan - Year-over-year growth 2023-2028 (%)
- 9.13 Market opportunity By Geographical Landscape
- Exhibit 115: Market opportunity By Geographical Landscape ($ billion)
- Exhibit 116: Data Tables on Market opportunity By Geographical Landscape ($ billion)
10 Drivers, Challenges, and Trends
- 10.1 Market drivers
- 10.2 Market challenges
- 10.3 Impact of drivers and challenges
- Exhibit 117: Impact of drivers and challenges in 2023 and 2028
- 10.4 Market trends
11 Vendor Landscape
- 11.1 Overview
- 11.2 Vendor landscape
- Exhibit 118: Overview on Criticality of inputs and Factors of differentiation
- 11.3 Landscape disruption
- Exhibit 119: Overview on factors of disruption
- 11.4 Industry risks
- Exhibit 120: Impact of key risks on business
12 Vendor Analysis
- 12.1 Vendors covered
- Exhibit 121: Vendors covered
- 12.2 Market positioning of vendors
- Exhibit 122: Matrix on vendor position and classification
- 12.3 ABB Ltd.
- Exhibit 123: ABB Ltd. - Overview
- Exhibit 124: ABB Ltd. - Business segments
- Exhibit 125: ABB Ltd. - Key offerings
- Exhibit 126: ABB Ltd. - Segment focus
- 12.4 AECOM
- Exhibit 127: AECOM - Overview
- Exhibit 128: AECOM - Business segments
- Exhibit 129: AECOM - Key news
- Exhibit 130: AECOM - Key offerings
- Exhibit 131: AECOM - Segment focus
- 12.5 AMETEK Inc.
- Exhibit 132: AMETEK Inc. - Overview
- Exhibit 133: AMETEK Inc. - Business segments
- Exhibit 134: AMETEK Inc. - Key offerings
- Exhibit 135: AMETEK Inc. - Segment focus
- 12.6 Arup Group Ltd.
- Exhibit 136: Arup Group Ltd. - Overview
- Exhibit 137: Arup Group Ltd. - Product / Service
- Exhibit 138: Arup Group Ltd. - Key offerings
- 12.7 Asetek AS
- Exhibit 139: Asetek AS - Overview
- Exhibit 140: Asetek AS - Business segments
- Exhibit 141: Asetek AS - Key offerings
- Exhibit 142: Asetek AS - Segment focus
- 12.8 Delta Electronics Inc.
- Exhibit 143: Delta Electronics Inc. - Overview
- Exhibit 144: Delta Electronics Inc. - Business segments
- Exhibit 145: Delta Electronics Inc. - Key offerings
- Exhibit 146: Delta Electronics Inc. - Segment focus
- 12.9 DPR Construction
- Exhibit 147: DPR Construction - Overview
- Exhibit 148: DPR Construction - Product / Service
- Exhibit 149: DPR Construction - Key offerings
- 12.10 Eaton Corp. Plc
- Exhibit 150: Eaton Corp. Plc - Overview
- Exhibit 151: Eaton Corp. Plc - Business segments
- Exhibit 152: Eaton Corp. Plc - Key news
- Exhibit 153: Eaton Corp. Plc - Key offerings
- Exhibit 154: Eaton Corp. Plc - Segment focus
- 12.11 Emerson Electric Co.
- Exhibit 155: Emerson Electric Co. - Overview
- Exhibit 156: Emerson Electric Co. - Business segments
- Exhibit 157: Emerson Electric Co. - Key news
- Exhibit 158: Emerson Electric Co. - Key offerings
- Exhibit 159: Emerson Electric Co. - Segment focus
- 12.12 FORTIS CONSTRUCTION Inc.
- Exhibit 160: FORTIS CONSTRUCTION Inc. - Overview
- Exhibit 161: FORTIS CONSTRUCTION Inc. - Product / Service
- Exhibit 162: FORTIS CONSTRUCTION Inc. - Key offerings
- 12.13 HDR Inc.
- Exhibit 163: HDR Inc. - Overview
- Exhibit 164: HDR Inc. - Product / Service
- Exhibit 165: HDR Inc. - Key offerings
- 12.14 Hensel Phelps
- Exhibit 166: Hensel Phelps - Overview
- Exhibit 167: Hensel Phelps - Key offerings
- 12.15 HITT CONTRACTING INC.
- Exhibit 168: HITT CONTRACTING INC. - Overview
- Exhibit 169: HITT CONTRACTING INC. - Product / Service
- Exhibit 170: HITT CONTRACTING INC. - Key offerings
- 12.16 Iron Mountain Inc.
- Exhibit 171: Iron Mountain Inc. - Overview
- Exhibit 172: Iron Mountain Inc. - Business segments
- Exhibit 173: Iron Mountain Inc. - Key offerings
- Exhibit 174: Iron Mountain Inc. - Segment focus
- 12.17 J.E. Dunn Construction Co.
- Exhibit 175: J.E. Dunn Construction Co. - Overview
- Exhibit 176: J.E. Dunn Construction Co. - Product / Service
- Exhibit 177: J.E. Dunn Construction Co. - Key offerings
13 Appendix
- 13.1 Scope of the report
- 13.2 Inclusions and exclusions checklist
- Exhibit 178: Inclusions checklist
- Exhibit 179: Exclusions checklist
- 13.3 Currency conversion rates for US$
- Exhibit 180: Currency conversion rates for US$
- 13.4 Research methodology
- Exhibit 181: Research methodology
- Exhibit 182: Validation techniques employed for market sizing
- Exhibit 183: Information sources
- 13.5 List of abbreviations
- Exhibit 184: List of abbreviations