Data Center Construction Market Growth & Trends:
The global data center construction market size is anticipated to reach USD 371.87 billion by 2030, expanding at a CAGR of 7.4% from 2023 to 2030, according to a study conducted by Grand View Research, Inc. The growth is fueled by the increasing demand for data storage and processing capabilities and the increased use of big data analytics. Furthermore, the growing trend of cloud computing and virtualization, along with the rise in digital transformation is also contributing to the market growth. Other significant factors driving the data center construction market growth include rising investment in infrastructure projects, increasing government spending on information technology, and greater demand from the enterprise sector.
The adoption of a software-defined data center in the healthcare industry is expected to drive data center construction market growth in the near future. There has been an increase in medical expenditures every year. The Institute for Health Metrics and Evaluation predicts that by 2040, healthcare spending will total USD 18.28 trillion, with high-income countries spending USD 9,019 per person. Despite the nascent stage that healthcare organizations are in with adopting modern IT infrastructure changes. Data management, networking, and server storage can be streamlined, unified, and improved by implementing a software-defined data center in the healthcare industry.
Asia Pacific IT infrastructure industry expanded significantly during fiscal 2019. The increase in sales of networking equipment, such as switches and routers, handles this expansion. Businesses like Huawei Technologies Co. Ltd., Dell, and HP Enterprises have all contributed significantly to the expansion of the market in the area. The introduction of new products by these businesses in the servers and networking sectors has helped the IT infrastructure market expand throughout the Asia Pacific. Additionally, this region is receiving a significant investment from cloud service companies. For instance, Amazon.com invested USD 339.7 billion in its Indian data center and e-commerce businesses in February 2020.
The increased construction of hyper-scale data centers throughout the world to store large amounts of data is creating a lucrative opportunity for industry participants. Hyper-scale data centers are utilized in a variety of industries to enhance computing power, memory, networking infrastructure, and storage resources. The physical infrastructure and distribution systems supporting the data centers for optimizing cooling efficiency, and the capacity to extensively scale computing workloads effectively, are among the different elements of hyper-scale data centers.
Internet of things (IoT), artificial intelligence (AI), and intelligent computing are gaining popularity in a variety of sectors and industrial verticals, creating opportunities for market participants. Developing countries have invested in data center infrastructure as part of their efforts to automate the economy. These facilities have witnessed widespread use in areas such as BFSI, manufacturing, healthcare, and energy, among others. For instance, in 2020, Wiwynn unveiled next-generation Open Compute Project (OCP) servers to meet the growing demand for cloud computing, artificial intelligence, and high-performance computing.
The network infrastructure ecosystem is benefitting from government initiatives aimed at reducing barriers to cross-border operations. As a result, key players like AT&T Intellectual Property, Huawei Technologies Co. Ltd, and Sky Telecom Inc, among others, have been aggressively investing in rising economies in Latin America, the Middle East, and other regions to expand their business. These market players are securing contracts and tapping into new markets to increase their presence with technological advancements and product innovations. In addition, these key players are pursuing various strategic activities, such as geographical expansion, acquisitions, mergers, and collaborations. For instance, in 2020, MOX Networks, LLC, and Cologix declared a new partnership to provide connectivity solutions across North America.
Data Center Construction Market Report Highlights:
- The IT infrastructure segment is expected to register a CAGR of 7.4% over the forecast period as a result of the increasing demand for high-performance computing servers, storage capacity, and sophisticated networking infrastructure.
- In Asia Pacific, the market is expected to witness high growth over the forecast period in line with the rapid development of IT and communication infrastructure and the continued rollout of 5G networks.
- Key players focus on product innovation and introduction of new technologies to their portfolio. For instance, in June 2018, Huawei Technologies Co. Ltd. released Smart DC 3.0, a solution that leverages AI technology to manage cooling and the utilization of power and resources.
Table of Contents
Chapter 1 Methodology and Scope
- 1.1 Market Segmentation & Scope
- 1.2 Research Methodology
- 1.3 Research Scope and Assumptions
- 1.3.1 Purchased Database
- 1.3.2 GVR'S Internal Database
- 1.3.3 List of secondary sources
- 1.3.4 Primary Research
- 1.4 List of Data sources
- 1.5 Market Formulation & Publishing
- 1.6 Data Validation & Publishing
Chapter 2 Executive Summary
- 2.1 Data Center Construction Market - Industry Snapshot & Key Buying Criteria, 2018 - 2030
- 2.2 Data Center Construction Market, 2018 - 2030 (USD Billion)
- 2.2.1 Data Center Construction Market, By IT Infrastructure, 2018 - 2030 (USD Billion)
- 2.2.2 Data Center Construction Market, By Power Distribution & Cooling Infrastructure, 2018 - 2030 (USD Billion)
- 2.2.3 Data Center Construction Market, By Miscellaneous Expenses, 2018 - 2030 (USD Billion)
- 2.2.4 Data Center Construction Market, By Tier Type, 2018 - 2030 (USD Billion)
- 2.2.4 Data Center Construction Market, By End-use, 2018 - 2030 (USD Billion)
Chapter 3 Data Center Construction Industry Outlook
- 3.1 Market Lineage Outlook
- 3.1.1 Parent Market Outlook
- 3.2 Data Center Construction Market Variable Analysis
- 3.2.1 Market Driver Analysis
- 3.2.2 Market Restraint/Challenge Analysis
- 3.3 Value Chain Analysis
- 3.4 Market Analysis Tools
- 3.4.1 Data Center Construction Industry Analysis - Porter's
- 3.4.2 Data Center Construction Industry Analysis - PEST
- 3.5 Impact of COVID on Data Center Construction Market
Chapter 4 Data Center Construction Market IT Infrastructure Outlook
- 4.1 Data Center Construction Market by IT Infrastructure Outlook, 2022 and 2030
- 4.2 Networking Equipment
- 4.2.1 Data center construction networking equipment server market, 2018 - 2030 (USD Billion)
- 4.3 Server
- 4.3.1 Data center construction server market, 2018 - 2030 (USD Billion)
- 4.4 Storage
- 4.4.1 Data center construction storage market, 2018 - 2030 (USD Billion)
Chapter 5 Data Center Construction Market PD and Cooling Infrastructure Outlook
- 5.1 Data Center Construction Market by PD and Cooling Infrastructure, 2022 and 2030
- 5.2 Power Distribution
- 5.2.1 Data center construction power distribution market, 2018 - 2030 (USD Billion)
- 5.3 Cooling
- 5.3.1 Data center construction cooling market, 2018 - 2030 (USD Billion)
Chapter 6 Data Center Construction Market Miscellaneous Expenses Outlook
- 6.1 Data Center Construction Market by Miscellaneous Expenses, 2022 and 2030
- 6.2 Miscellaneous Expenses
- 6.2.1 Data center construction miscellaneous expenses market, 2018 - 2030 (USD Billion)
Chapter 6 Data Center Construction Market Tier Type Outlook
- 6.1 Data Center Construction Market by Tier Type, 2022 and 2030
- 6.2 Tier 1
- 6.2.1 Data center construction Tier 1 market, 2018 - 2030 (USD Billion)
- 6.3 Tier 2
- 6.3.1 Data center construction Tier 2 market, 2018 - 2030 (USD Billion)
- 6.4 Tier 3
- 6.4.1 Data center construction Tier 3 market, 2018 - 2030 (USD Billion)
Chapter 7 Data Center Construction Market End-use Outlook
- 7.1 Data Center Construction Market by End-use, 2022 and 2030
- 7.2 IT & Telecom
- 7.2.1 Data center construction IT & Telecom market, 2018 - 2030 (USD Billion)
- 7.3 BFSI
- 7.3.1 Data center construction BFSI market, 2018 - 2030 (USD Billion)
- 7.4 Governtment & Defense
- 7.4.1 Data center construction Government & Defense market, 2018 - 2030 (USD Billion)
- 7.5 Healthcare
- 7.5.1 Data center construction Healthcare market, 2018 - 2030 (USD Billion)
- 7.6 Energy
- 7.6.1 Data center construction Energy market, 2018 - 2030 (USD Billion)
- 7.7 Others
- 7.7.1 Data center construction Others market, 2018 - 2030 (USD Billion)
Chapter 7 Data Center Construction Market Regional Outlook
- 7.1 Data Center Construction Market Share by Region, 2022 & 2030
- 7.2 North America
- 7.2.1 North America Data Center Construction market, 2018 - 2030 (USD Million)
- 7.2.2 North America Data Center Construction market, by IT infrastructure, 2018 - 2030 (USD Million)
- 7.2.3 North America Data Center Construction market, by PD and cooling infrastructure, 2018 - 2030 (USD Million)
- 7.2.4 North America Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Million)
- 7.2.5 North America Data Center construction market, by tier type, 2018 - 2030 (USD Million)
- 7.2.6 North America Data Center Construction market, by end-use, 2018 - 2030 (USD Million)
- 7.2.7 U.S.
- 7.2.7.1 U.S. data center construction market, 2018 - 2030 (USD Billion)
- 7.2.7.2 U.S. data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.2.7.3 U.S. data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.2.7.4 U.S. Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.2.7.5 U.S. data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.2.7.6 U.S. data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.2.8 Canada
- 7.2.8.1 Canada data center construction market, 2018 - 2030 (USD Billion)
- 7.2.8.2 Canada data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.2.8.3 Canada data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.2.8.4 Canada Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.2.8.5 Canada data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.2.8.6 Canada data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.3 Europe
- 7.3.1 Europe Data Center Construction market, 2018 - 2030 (USD Million)
- 7.3.2 Europe Data Center Construction market, by IT infrastructure, 2018 - 2030 (USD Million)
- 7.3.3 Europe Data Center Construction market, by PD and cooling infrastructure, 2018 - 2030 (USD Million)
- 7.3.4 Europe Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Million)
- 7.3.5 Europe Data Center construction market, by tier type, 2018 - 2030 (USD Million)
- 7.3.6 Europe Data Center Construction market, by end-use, 2018 - 2030 (USD Million)
- 7.3.7 U.K.
- 7.3.7.1 U.K. data center construction market, 2018 - 2030 (USD Billion)
- 7.3.7.2 U.K. data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.3.7.3 U.K. data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.3.7.4 U.K. Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.3.7.5 U.K. data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.3.7.6 U.K. data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.3.8 Germany
- 7.3.8.1 Germany data center construction market, 2018 - 2030 (USD Billion)
- 7.3.8.2 Germany data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.3.8.3 Germany data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.3.8.4 Germany Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.3.8.5 Germany data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.3.8.6 Germany data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.3.9 France
- 7.3.9.1 France data center construction market, 2018 - 2030 (USD Billion)
- 7.3.9.2 France data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.3.9.3 France data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.3.9.4 France Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.3.9.5 France data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.3.9.6 France data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.3.8 Italy
- 7.3.8.1 Italy data center construction market, 2018 - 2030 (USD Billion)
- 7.3.8.2 Italy data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.3.8.3 Italy data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.3.8.4 Italy Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.3.8.5 Italy data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.3.8.6 Italy data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.3.9 Spain
- 7.3.9.1 Spain data center construction market, 2018 - 2030 (USD Billion)
- 7.3.9.2 Spain data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.3.9.3 Spain data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.3.9.4 Spain Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.3.9.5 Spain data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.3.9.6 Spain data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.4 Asia Pacific
- 7.4.1 Asia Pacific Data Center Construction market, 2018 - 2030 (USD Million)
- 7.4.2 Asia Pacific Data Center Construction market, by IT infrastructure, 2018 - 2030 (USD Million)
- 7.4.3 Asia Pacific Data Center Construction market, by PD and cooling infrastructure, 2018 - 2030 (USD Million)
- 7.4.4 Asia Pacific Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Million)
- 7.4.5 Asia Pacific Data Center construction market, by tier type, 2018 - 2030 (USD Million)
- 7.4.6 Asia Pacific Data Center Construction market, by end-use, 2018 - 2030 (USD Million)
- 7.4.7 China
- 7.4.7.1 China data center construction market, 2018 - 2030 (USD Billion)
- 7.4.7.2 China data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.4.7.3 China data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.4.7.4 China Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.4.7.5 China data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.4.7.6 China data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.4.8 India
- 7.4.8.1 India data center construction market, 2018 - 2030 (USD Billion)
- 7.4.8.2 India data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.4.8.3 India data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.4.8.4 India Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.4.8.5 India data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.4.8.6 India data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.4.9 Japan
- 7.4.9.1 Japan data center construction market, 2018 - 2030 (USD Billion)
- 7.4.9.2 Japan data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.4.9.3 Japan data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.4.9.4 Japan Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.4.9.5 Japan data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.4.9.6 Japan data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.4.10 Australia
- 7.4.10.1 Australia data center construction market, 2018 - 2030 (USD Billion)
- 7.4.10.2 Australia data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.4.10.3 Australia data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.4.10.4 Australia Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.4.10.5 Australia data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.4.10.6 Australia data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.4.11 South Korea
- 7.4.11.1 South Korea data center construction market, 2018 - 2030 (USD Billion)
- 7.4.11.2 South Korea data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.4.11.3 South Korea data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.4.11.4 South Korea Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.4.11.5 South Korea data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.4.11.6 South Korea data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.5 Latin America
- 7.5.1 Latin America Data Center Construction market, 2018 - 2030 (USD Million)
- 7.5.2 Latin America Data Center Construction market, by IT infrastructure, 2018 - 2030 (USD Million)
- 7.5.3 Latin America Data Center Construction market, by PD and cooling infrastructure, 2018 - 2030 (USD Million)
- 7.5.4 Latin America Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Million)
- 7.5.5 Latin America Data Center construction market, by tier type, 2018 - 2030 (USD Million)
- 7.5.6 Latin America Data Center Construction market, by end-use, 2018 - 2030 (USD Million)
- 7.5.7 Brazil
- 7.5.7.1 Brazil data center construction market, 2018 - 2030 (USD Billion)
- 7.5.7.2 Brazil data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.5.7.3 Brazil data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.5.7.4 Brazil Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.5.7.5 Brazil data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.5.7.6 Brazil data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.5.8 Mexico
- 7.5.8.1 Mexico data center construction market, 2018 - 2030 (USD Billion)
- 7.5.8.2 Mexico data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.5.8.3 Mexico data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.5.8.4 Mexico Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.5.8.5 Mexico data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.5.8.6 Mexico data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.5.9 Argentina
- 7.5.9.1 Argentina data center construction market, 2018 - 2030 (USD Billion)
- 7.5.9.2 Argentina data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.5.9.3 Argentina data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.5.9.4 Argentina Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.5.9.5 Argentina data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.5.9.6 Argentina data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.6 Middle East & Africa
- 7.6.1 Middle East & Africa Data Center Construction market, 2018 - 2030 (USD Million)
- 7.6.2 Middle East & Africa Data Center Construction market, by IT infrastructure, 2018 - 2030 (USD Million)
- 7.6.3 Middle East & Africa Data Center Construction market, by PD and cooling infrastructure, 2018 - 2030 (USD Million)
- 7.6.4 Middle East & Africa Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Million)
- 7.6.5 Middle East & Africa Data Center construction market, by tier type, 2018 - 2030 (USD Million)
- 7.6.6 Middle East & Africa Data Center Construction market, by end-use, 2018 - 2030 (USD Million)
- 7.6.7 UAE
- 7.6.7.1 UAE data center construction market, 2018 - 2030 (USD Billion)
- 7.6.7.2 UAE data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.6.7.3 UAE data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.6.7.4 UAE Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.6.7.5 UAE data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.6.7.6 UAE data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.6.8 Saudi Arabia
- 7.6.8.1 Saudi Arabia data center construction market, 2018 - 2030 (USD Billion)
- 7.6.8.2 Saudi Arabia data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.6.8.3 Saudi Arabia data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.6.8.4 Saudi Arabia Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.6.8.5 Saudi Arabia data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.6.8.6 Saudi Arabia data center construction market, by end-use, 2018 - 2030 (USD Billion)
- 7.6.9 South Africa
- 7.6.9.1 South Africa data center construction market, 2018 - 2030 (USD Billion)
- 7.6.9.2 South Africa data center construction market, by IT infrastructure, 2018 - 2030 (USD Billion)
- 7.6.9.3 South Africa data center construction market, by PD and cooling, 2018 - 2030 (USD Billion)
- 7.6.9.4 South Africa Data Center Construction market, by miscellaneous expenses, 2018 - 2030 (USD Billion)
- 7.6.9.5 South Africa data center construction market, by tier type, 2018 - 2030 (USD Billion)
- 7.6.9.6 South Africa data center construction market, by end-use, 2018 - 2030 (USD Billion)
Chapter 8 Competitive Analysis
- 8.1 Company Categorization (Mature Players, Emerging Players)
- 8.2 Company Ranking Analysis, 2022
- 8.3 Strategy Mapping
- 8.4 Company Profiles (Overview, Financial Performance, Product Overview, Strategic Initiatives)
- 8.4.1 Acer Inc.
- 8.4.2 Cisco Systems, Inc.
- 8.4.3 Dell Inc.
- 8.4.4 Fujitsu
- 8.4.5 Hewlett Packard Enterprise Development LP
- 8.4.6 Huawei Technologies Co., Ltd.
- 8.4.7 IBM
- 8.4.8 Lenovo
- 8.4.9 Oracle
- 8.4.10 Inspur
- 8.4.11 Ascenty
- 8.4.12 ABB
- 8.4.13 Hitachi, Ltd.
- 8.4.14 Equinix, Inc.
- 8.4.15 Gensler
- 8.4.16 Schneider Electric
- 8.4.17 HostDime Global Corp.
- 8.4.18 IPXON Networks
- 8.4.19 KIO Networks
- 8.4.20 Vertiv Group Corp.