Abstract
Nuclear Power in Czech Republic, Market Outlook to 2020, 2011 Update - Capacity, Generation, Regulations, Power Plants, Companies
Summary
Czech Republic has a total installed capacity of 20,612 MW with installed nuclear capacity of 3,678 MW in 2010. The Czech Republic has six nuclear power reactors operating in the country with 26 billion kWh of nuclear power generated as of 2010. The nuclear energy contributes around 31% of country’s electricity generation. The nuclear reactors are of Pressurized Water Reactor (PWR) type. Nuclear energy plays an important role in the Czech Republic’s electricity generation mix. CEZ, a.s is the key player in the Czech Republic’s nuclear energy industry. The various modernization programs comprising power uprates by replacing necessary equipment; country’s nuclear policy with acts and decrees emphasizing efficient operation of nuclear power plants ensuring safety measures; and the research and development activities over the years in the field of nuclear energy indicates the growth of nuclear power industry in the Czech Republic.
Scope
• The report analyzes Czech Republic’s nuclear power industry to 2020.
• Explores and analyzes the trends and developments in Czech Republic' s nuclear power industry.
• Provides details about historic and forecast installed nuclear capacity and generation.
Reasons To Buy
The report will enhance your decision making capability in a more rapid and time sensitive manner. It will allow you to -
• Gain most up to date information and analysis on Czech Republic’s nuclear power industry.
• Understand the role of nuclear power in the country' s energy mix.
• Facilitate decision making by understanding the trends and developments in Czech Republic' s nuclear power industry.
Companies Mentioned
CEZ,a.s
Table of Contents
1 Table Of Contents
1 Table Of Contents
1.1 List of Tables
1.2 List of figures
2 Executive Summary
2.1 Nuclear Power Industry in Czech Republic
2.2 Trends and Developments in Czech Republic’s Nuclear Power Industry
3 Introduction
3.1 GlobalData Report Guidance
4 Nuclear Power Industry in Czech Republic
4.1 Overview
4.2 Czech Republic Power
4.2.1 Czech Republic, Power Overview
4.2.2 Czech Republic Power, Installed Capacity and Generation
4.3 Czech Republic has Plans to Expand Nuclear Power in the Country
4.3.1 Czech Republic, Nuclear Installed Capacity and Generation, 2000-2020
4.3.2 Czech Republic, Commercial Nuclear Reactors
4.4 Regulatory Framework: Emphasis on Nuclear Safety
4.4.1 Nuclear Policy
4.4.2 Regulations
4.4.3 Regulatory Agencies
5 Trends and Developments in Czech Republic’s Nuclear Power Industry
5.1 Key Drivers, Challenges and Trends
5.1.1 Key Drivers
5.1.2 Challenges
5.1.3 Trends
5.2 Czech Republic, Nuclear Power Industry Outlook
6 Czech Republic, Nuclear Power Plants, Reactor Details, 2011
6.1 Dukovany 1, Nuclear Plant Technical Details
6.2 Dukovany 2, Nuclear Plant Technical Details
6.3 Dukovany 3, Nuclear Plant Technical Details
6.4 Dukovany 4, Nuclear Plant Technical Details
6.5 Temelin 1, Nuclear Plant Technical Details
6.6 Temelin 2, Nuclear Plant Technical Details
7 Key Players in Czech Republic’s Nuclear Industry
7.1 CEZ,a.s
7.1.2 Business Description
7.1.3 Major Products and Services
7.1.4 History
7.1.5 Locations and Subsidiaries
8 Appendix
8.1 Abbreviations (in alphabetical order)
8.2 Methodology
8.3 Coverage
8.4 Secondary Research
8.5 Primary Research
8.6 Modeling and Forecasting
8.7 Contact Us
8.8 Disclaimer
List of Tables
1.1 List of Tables
Table 1: Czech Republic, Historic and Forecasted Power Generation Capacity, MW, 2000-2020
Table 2: Czech Republic, Historic and Forecast Generation of Electricity, BkWh, 2000-2020
Table 3: Czech Republic, Nuclear Installed Capacity, MW, 2000-2020
Table 4: Czech Republic, Nuclear Power Generation, BkWh, 2000-2020
Table 5: Czech Republic, Operational Nuclear Power Reactors, 2011
Table 6: Czech Republic, Dukovany 1, Nuclear Plant Technical Details
Table 7: Czech Republic, Dukovany 2, Nuclear Plant Technical Details
Table 8: Czech Republic, Dukovany 3, Nuclear Plant Technical Details
Table 9: Czech Republic, Dukovany 4, Nuclear Plant Technical Details
Table 10: Czech Republic, Temelin 1, Nuclear Plant Technical Details
Table 11: Czech Republic, Temelin 2, Nuclear Plant Technical Details
Table 12: Major Products and Services
Table 13: CEZ, a.s., Other Locations
Table 14: CEZ, a.s., Subsidiaries
Table 15: Abbreviations
List of Figures
1.2 List of figures
Figure 1: Czech Republic, Power Generation by Fuel Type, Percentage share, %, 2010
Figure 2: Czech Republic, Power Generation Capacity, MW, 2000-2020
Figure 3: Czech Republic, Electricity Generation, BkWh, 2000-2020
Figure 4: Czech Republic, Historic and Forecast Nuclear Installed Capacity, MW, 2000-2020
Figure 5: Czech Republic, Historic and Projected Nuclear Generation, BkWh, 2000-2020