首頁 產業/市場分類 出版商一覽 Email 通知 GII媒體代理會議 公司簡介 聯絡我們
- English Japanese Korean
首頁 > 市場調查報告書 > 能源 > 發電設備 > 撒哈拉沙漠以南的非洲發電廠維護、修理、檢查策略
產業/市場分類
能源 (4001)
太陽光發電 (311)
石化燃料 (896)
風力發電 (162)
核能 (83)
智慧電網 (226)
發電設備 (993)
電力市場 (387)
電池 (205)
綠色能源 (786)
燃料電池 (76)
UPS (62)
市場調查報告書

撒哈拉沙漠以南的非洲發電廠維護、修理、檢查策略

Sub-Saharan Africa Power Plant Maintenance Repair and Overhaul (MRO) Strategies

出版商 Frost & Sullivan
出版日期 2007年04月 商品編碼 52763
內容資訊 英文 165 Pages
價格
US $ 12500 Web Access (Regional License)
US $ 13000 Hard Copy & Web Access (Regional License)


撒哈拉沙漠以南的非洲發電廠維護、修理、檢查策略 是由出版商Frost & Sullivan在2007年04月所出版的。 這份英文市場調查報告書包含165 Pages 價格從美金12500起跳。

目錄

Abstract

This Frost & Sullivan research service titled Sub-Saharan Africa Power Plant Maintenance Repair and Overhaul Strategies (MRO) Strategies provides a detailed analysis of the strategic adjustments required by original equipment manufacturers to gain a competitive edge in the market. In this research, Frost & Sullivan' s expert analysts thoroughly examine the following markets: boilers, steam turbines, gas turbines, hydro turbines and generators.

This analysis is available through our Energy and Power Growth Partnership Service programme. With this programme, clients receive industry-leading market research such as this, along with technical and econometric data and many interactive features including Analyst Inquiry Time and Client Councils.

Table of Contents

1. Introduction to the Sub-Saharan Africa MRO Market

  • 1. Executive Summary
    • 1. Objectives
    • 2. Methodology
    • 3. Summary of Major Findings
  • 2. Profile of Maintenance Behavior and Preferences
    • 1. Routine Maintenance
    • 2. Spare Parts Supply
    • 3. Major Overhauls and Repairs
  • 3. Relationship with the OEM
    • 1. Notice Period for Major Overhauls
    • 2. Tender Process
    • 3. Adherence to Inspections and Maintenance Recommendations
  • 4. Route to Market and Decision Making
    • 1. Initial Point of Contact
    • 2. Decision Makers
  • 5. Service Provider Assessment
    • 1. Supplier Selection Criteria
    • 2. Overall Satisfaction
  • 6. Detailed Satisfaction Analysis
    • 1. Price Competitiveness
    • 2. Delivery Time and Speed of Response
    • 3. Quality of Work
    • 4. Technical Know-How
    • 5. Customer Service
  • 7. Future Prospects for Full Maintenance Contracts
    • 1. Full Maintenance Contracts
    • 2. Future Prospects
  • 8. Conclusion
Back to Top