[英文調查報告書]

中國水力發電產業及投資預測:2007年至2008年

2007-2008 Report on the Survey & Forecast of Investment Prospect of Hydropower Industry in China

商品編碼 : 52816
出版日期 : 2007/06

Price

- -
此出版品為英文撰寫

Abstract

In 2006, the gross generated energy in China has reached 2755.7 billion KWH, which has increased by 13.67% as compared with 2005, while the generated energy of hydropower has reached 378.3 billion KWH, which has increased by 3.5 0% as compared with the same period last year. The proportion of hydropower in the gross generated energy was 13.7% in 2006, which has dropped by 1.5% than 2005. The pace of construction of hydropower station is evidently behind with the average progress of power construction all over the country. The total amount of new generating sets put into service in 2006 was 101,170 MW, which has exceeded the generally prospected amount of 90,000 MW. The gross installed generating capacity at the end of 2006 has reached 622,000 MW that has increased by 20.3% as compared with the same period of last year, which has hit an all-time high in the annual growth. As for the composition of power source, the percentage of thermal power was 77.8 % that has increased by 2.1 percentage points; the percentage of hydropower was 20.7 %, which has dropped by 2.0 percentage points, and this was the result of pursuing the improvement of supply capability steadily and fast in a short time under the condition of electric power shortage. The average exploitation level of hydropower in developed countries is above 60%. Among the countries, the percentage of exploited hydroelectric resource is about 82% in the USA, 84% in Japan and 65% in Canada. Comparing with these countries, the hydroelectric development in our country is still at a comparatively low level, and still has great development potential.

At present, the installed generation capacity of hydropower all over the world is about 800 million KW, which meets 20% of the global electricity requirement. The development and utilization of hydro energy resource has made significant contributions for the human civilization and social progress. China is relatively rich in Hydro energy resource, of which the installed generation capacity available for exploitation exceeds 400 million KW, and the annual energy output is more than 1700 billion KWH, so hydro energy resource is an important energy resource in China. The potential hydropower resource in our country comes first in the world. In accordance with the re-check result of hydropower resource in 2003, the amount of rivers of which the potential hydro energy is above 1,000 KW was 33,886 in our country (mainland). The theoretical potential hydropower resource was 6080 billion KWH of annual quantity of electricity with an average power of 694 million KW, which makes up about 1/6 of the quantity of electricity all over the world. The 542 million KW of technical development capacity available has made up 78.1% of the average power, and the 2470 billion KWH of annual energy output has made up 40.6 % of theoretical potential quantity of electricity. Therefore, the development of hydropower industry in our country has a great geographical advantage.

Emphasize on the exploitation of resources in the west part of China. According to the relevant information, the amount of hydropower resource available for development and utilization in our country can reach 37.8 billion KW, which come first in the world. Southwest China is very rich in hydropower resource, and 68% of the total amount of hydropower resource available for exploitation concentrates in this region, of which the ratio of resource developed and used is less than 10% now. The exploitation of hydropower resource in the southwest may promote the development of the relevant industries of communication, cement, steel product, electromechanical etc. The positive and steady implementation of the plan of "Transport the Electricity from the West to the East" may optimize the power utilization structure in the East and improve the regional ecological environment, while offering the electricity required by the development of the East.

In accordance with the preliminary planning, by the year of 2020, the a mount of installed generation capacity of hydropower all over the country will reach 270 million KW, which accounts for 29% of the installed gross capacity of electric power, and the hydroelectric development level will reach 68%. The the direct benefit of power generation is equivalent to the saving of 420 million ton of standard coal equivalent. The reduction is 1.17 billion ton of CO2, 7.5 million ton of sulfur dioxide and other kinds of harmful gas. It will play an important role in the reduction of global air pollution and greenhouse effect and makes great environmental benefit. Hydropower construction may also take account of the comprehensive benefit of flood prevention, irrigation and transportation etc., and at the same time, it also will make the social benefit of the promotion of economic growth and social development, and the poverty alleviation. Therefore, the hydropower industry has a great long-term potential and is favored by lots of investment institutions.

Table of Contents

Section 1 Situation of China Hydropower Resources

  • 1.1.1 Reserves and Distribution of China' s Hydro-energy resources
  • 1.1.2 Characteristics of China' s Hydro-energy resources
  • 1.2.1 General Application
  • 1.2.2 Twelve Hydropower Bases
  • 1.2.3 Hot spot Area Analysis on Current China' s Hydropower Resources Development
  • 1.2.4 The principal problems

Section 2 Hydro-Energy Resources & Application of China Main Rivers

  • 2.1.1 General Situation
  • 2.1.2 Analysis on upper hydro-energy resource and development
  • 2.1.3 Analysis on middle hydro-energy resource and development
  • 2.2.1 Analysis on hydro-energy resource and utilization of Nujiang River
  • 2.2.2 Analysis on Hydro-energy Resource and Utilization Lancangjiang River
  • 2.2.3 Analysis on hydro-energy resource and utilization of Dulong River
  • 2.2.4 Analysis on hydro-energy resource and utilization of Yarlung Zangbo River
  • 2.3.1 General Situation
  • 2.3.2 Analysis on hydro-energy resource and development of Yellow River upstream
  • 2.3.3 Main Problems and Measure during the development of hydro-power in the upstream of Yellow River
  • 2.3.4 Analysis on hydro-energy resource and development of middle stream of Yellow River
  • 2.3.5 Hydropower Development Plan of Yellow River upper and middle stream
  • 2.3.6 Forecast of Development of Yellow River Hydropower
  • 2.4.1 General Situation
  • 2.4.2 Analysis on hydro-energy resource and development of main branches of Pearl River
  • 2.4.3 Hydropower Development Plan
  • 2.5.1 General Situation
  • 2.5.2 Analysis on hydro-energy resource and development of Main Branches
  • 2.6.1 Development and Utilization of Hailuan River Hydro-energy Resources
  • 2.7.1 Development and Utilization of Huai River Basin Hydro-energy Resources
  • 2.8.1 Analysis on hydropower resource and development of Heilongjiang river system
  • 2.8.2 Analysis on hydropower resource and development of Tumen River system
  • 2.8.3 Analysis on hydropower resource and development of Yalu river system
  • 2.8.4 Analysis on hydropower resource and development of Liaohe river system

Section 3 Status & Trend of Global Hydropower Industry

  • 3.1.1 General Development
  • 3.1.2 Europe
  • 3.1.3 North America
  • 3.1.4 Asia
  • 3.2 Analysis on Global Hydropower Development
  • 3.3 Successful Experience and Revelation of Global Hydropower Industry
  • 3.4 Main Problems in the Development of Global Hydropower Industry
  • 3.5 Forecast of Development Trend of Global Hydropower Industry

Section 4 Analysis on Development Environment of China Hydropower Industry, 2007-2008

  • 4.1.1 Development Plan of Power Industry during the period of "Eleventh Five-year Plan"
  • 4.1.2 Analysis on the development of hydropower industry affected by "Transport the Electricity from the West to the East" strategy
  • 4.1.3 Analysis on financing and investment in hydropower industry
  • 4.1.4 Analysis on Tax policy of hydropower Industry
  • 4.1.5 Change of foreign investment policy on hydropower in post-WTO
  • 4.1.6 Forecast on key development areas and restructure of hydropower
  • 4.2.1 Influence of United Nations Framework Convention on Climate Change on the hydropower development
  • 4.2.1 The influence of Law of Environmental Impact Assessment on hydropower development in our country
  • 4.2.3 The influence of Environmental Protection Act of Construction Item to Hydropower development
  • 4.3.1 The Analysis on the stability of hydrologic records of main rivers in China
  • 4.3.2 Main ways to maintain the stability of hydropower water supply

Section 5 Analysis & Research on Policies & System Reform of Hydropower Industry

  • 5.1.1 Transmission from active development to orderly development
  • 5.1.2 Analysis on the draft plan of China' s power during the period of "Eleventh Five-year Plan"
  • 5.1.3 "Notice on accelerating the restructuring of the electric power industry, promote the healthy and orderly development"
  • 5.1.4 Implementation of "renewable energy Law"
  • 5.2.1 System reform policy of China' s electric power
  • 5.2.2 Electric power system reform of foreign countries as reference
  • 5.3 Outlook of China' s Hydropower Industry-Related Policy, 2007-2008

Section 6 Analysis on the Overall Operation of China Hydropower Industry, 2006

  • 6.1 Analysis on Overall China' s Hydropower Industry
  • 6.2 Status of Hydropower in China' s Energy System
    • 6.3.1 Big investment, long period of construction
    • 6.3.2 Long-term benefits, and the short-term poor benefits, slow recovery of funds
    • 6.3.3 Natural and seasonal influence
    • 6.3.4 Uneven distribution of water and electricity, more in the west, less in the east
    • 6.4.1 Slow process of hydropower industry
    • 6.4.2 Grid construction is lagging behind, restricting the development of domestic hydroelectric industries
    • 6.4.3 The formation of price control mechanism restricts development of hydropower industry

Section 7 Analysis on Production Ability of China Hydropower Industry, 2007-2008

  • 7.1 Analysis on Production of Hydropower Industry, 2006
  • 7.2 Analysis on Installed Capacity of China' s Hydropower Changes, 2007-2008
  • 7.3 Analysis on the Changes of China Hydropower Generation, 2007-2008
  • 7.4 Analysis on Hydropower Production, 2007-2008
    • 7.4.1 Index of General Economic Operation
    • 7.4.2 Analysis on Hydropower Production in Different Area
    • 7.4.3 Analysis on different ownership enterprises
    • 7.4.4 Analysis on enterprises with different scale
  • 7.5 Main Problems in Hydropower Generation in China

Section 8 Forecast & Analysis on Supply & Demand in China Hydropower Market, 2007-2008

  • 8.1.1 Analysis on development trend of power consumption
  • 8.1.2 Analysis on China' s power demand
  • 8.2.1 Analysis on thermal power supply
  • 8.2.2 Analysis on nuclear power supply
  • 8.2.3 Analysis and Forecast of Wind Power Supply
  • 8.2.4 Analysis and Forecast of Gas power supply
  • 8.2.5 Analysis on thermal power, nuclear power, wind power and gas power generation projects
  • 8.2.6 Analysis on supply and demand of Non-hydropower
  • 8.3 Forecasts of China' s Demand for Hydropower Market, 2007-2008

Section 9 Analysis on Sales Channel & Marketing Modes of China Hydropower, 2007-2008

  • 9.1 Analysis on Sales Channels of Current Hydropower
  • 9.2 Comparative Analysis on Advantages and Disadvantages of Major Clients Direct Electricity and Bidding
  • 9.3 Relations between Differentiated Pricing and Bidding
    • 9.3.1 Grid price difference between Hydropower and thermal power
    • 9.3.2 Price difference among the hydro-electricity in different regions
  • 9.4 Analysis on Trading Patterns of Different Types of Hydropower
    • 9.4.1 Hydropower station with Comprehensive Utilization mainly and balance generating
    • 9.4.2 Stations integrating power generation, flood control, shipping
    • 9.4.3 Runoff - Hydropower Station
    • 9.4.4 Hydropower stations with regulatory functions over the quarter
    • 9.4.5 Cascade Hydropower
  • 9.5 Analysis on Diversification Trend of Hydropower Sales
  • 9.6 Discussion on the Hydropower onto-grid Discrimination
    • 9.6.1 Status of private Grid utilities and foreign enterprises
    • 9.6.2 China' s hydropower Grid policies
    • 9.6.3 The main problems of Chinese private and foreign investment in hydropower Grid
    • 9.6.4 Whether discrimination exists in Grid

Section 10 Analysis on China Hydropower onto-grid Price Competition, 2007-2008

  • 10.1 Analysis on China' s Electricity Price reform
  • 10.2 Analysis on China' s Power Bidding Status
  • 10.3 Comparison of Costs among Main Power Sources in China
    • 10.3.1 Cost of Thermal Power
    • 10.3.2 Generation Cost of Hydropower
    • 10.3.3 Generation Cost of Nuclear Power
    • 10.3.4 Generation Cost of Wind Power
    • 10.3.5 Generation Cost of Solar Power
  • 10.4 Competitive Advantage of China' s Hydropower Onto-grid Prices
  • 10.5 Development Trend of China' s Hydropower Bidding

Section 11 Forecast of China Hydropower Equipment Industry, 2007-2008

  • 11.1 Analysis on Hydropower Equipment Market
    • 11.1.1 Analysis on electrical equipment production growth
    • 11.1.2 Production of power generating equipment
  • 11.2 Development Opportunities of Hydropower Equipment Market
    • 11.2.1 Forecast of Demand for Generating Equipment at home and abroad
    • 11.2.2 Grid planning
    • 11.2.3 Forecast and Trend of Hydropower Equipment Industry

Section 12 Analysis on China Constructing & Planning Hydropower Projects Scale, 2007-2008

  • 12.1 Scale of China' s Hydropower
  • 12.2 Proposed Scale of China' s Hydropower, 2007-2008
  • 12.3 Analysis on Installed Capacity of China' s Hydropower, 2007-2008

Section 13 Forecast & Analysis on the Competition in China Hydropower Industry, 2007-2008

  • 13.1 Overall Pattern of Competition among China Hydropower Industry
    • 13.1.1 Original "five power companies" further strengthen hydropower
    • 13.1.2 Huge State-owned Enterprises have brought an enormous amount of money into the electricity
    • 13.1.3 Central Electricity Generations merger with local hydropower enterprises have become the trend
    • 13.1.4 Hydropower Development accelerates
  • 13.2 Analysis on Competitive Groups in China' s Hydropower Industry
    • 13.2.1 Classification of Competitive Groups in China' s Hydropower Industry
    • 13.2.2 SWOT
    • 13.3.1 Inevitable inter-regional expansion of large enterprises generating
    • 13.3.2 Low-cost advantages of hydropower is gradually emerging
    • 13.3.3 SHP investment prospect
    • 13.3.4 Foreign and private capital enter the hydropower sector investment
    • 13.3.5 Integrated energy companies will become the trend within the next decade

Section 14 Analysis on Regional Development of China Hydropower Industry, 2007-2008

  • 14.1 Analysis on Sichuan Hydropower Development
    • 14.1.1 Water resource and development of Sichuan
    • 14.1.2 Sichuan hydropower development and investment policy
    • 14.1.3 Sichuan Constructing and Planning Hydropower Projects
    • 14.1.4 Sichuan main rivers with much developed value
    • 14.1.5 Sichuan hydropower industry development trend
  • 14.2 Analysis on Hydropower Development in Yunnan
    • 14.2.1 Yunnan water resources and development situation
    • 14.2.2 Yunnan hydropower development and investment policy
    • 14.2.3 Yunnan Constructing and Planning Hydropower Projects
    • 14.2.4 Yunnan main rivers with much developed value
    • 14.2.5 Yunnan hydropower industry development trend
  • 14.3 Analysis on Guizhou Hydropower Development
    • 14.3.1 Guizhou water resources and development situation
    • 14.3.2 Guizhou Constructing and Planning Hydropower Projects
    • 14.3.3 Guizhou main rivers with much developed value
    • 14.3.4 Development trend of Guizhou hydropower industry
  • 14.4 Analysis on Guangxi Hydropower Development
    • 14.4.1 Guangxi water resources and development situation
    • 14.4.2 Guangxi hydropower development and investment policy
    • 14.4.4 Main rivers with much developed value in Guangxi Xijiang river system
  • 14.5 Analysis on Hubei Hydropower Development
    • 14.5.1 Hubei water resources and development situation
    • 14.5.3 Hubei main rivers with much developed value
    • 14.5.5 Development trend of Hydropower industry in Hubei
  • 14.6 Analysis on Hunan Hydropower Development
    • 14.6.1 Hunan water resources and development situation
    • 14.6.2 Hunan hydropower development and investment policy
    • 14.6.3 Hunan main rivers with much developed value
    • 14.6.4 Hunan Constructing and Planning Hydropower Projects
    • 14.6.5 Onto-grid and common measure of Hunan Hydropower
    • 14.6.6 Hunan hydropower industry development trend

Section 15 Operation of Key Listing Companies of Hydropower Industry

  • 15.1 China Yangtze Power Co. Ltd.
    • 15.1.1 Basic Situation
    • 15.1.2 Business Situation in Recent Three Years
    • 15.1.3 Plant Distribution and Power Resource Structure
    • 15.1.4 Analysis on Constructing and Planning Projects, 2007-2008
    • 15.1.5 Development Plan during the Period of "Eleventh Five-year Plan"
    • 15.1.6 Business Diversification
  • 15.2 Chongqing Three Gorges Electric Power Co. Ltd.
    • 15.2.1 Basic Situation
    • 15.2.2 Business Situation in Recent Three Years
    • 15.2.3 Plant Distribution and Power Resource Structure
    • 15.2.4 Analysis on Constructing and Planning Projects, 2007-2008
    • 15.2.5 Development Plan during the Period of "Eleventh Five-year Plan"
    • 15.2.6 Business Diversification
    • 15.3.1 Basic Situation
    • 15.3.2 Business Situation in Recent Three Years
    • 15.3.3 Plant Distribution and Power Resource Structure
    • 15.3.4 Analysis on Constructing and Planning Projects, 2007-2008
    • 15.3.5 Development Plan during the Period of "Eleventh Five-year Plan"
    • 15.3.6 Business Diversification
  • 15.4 Guangxi Guidong Electric Power Co. Ltd.
    • 15.4.1 Basic Situation
    • 15.4.2 Business Situation in Recent Three Years
    • 15.4.3 Plant Distribution and Power Resource Structure
    • 15.4.4 Analysis on Constructing and Planning Projects, 2007-2008
    • 15.4.5 Development Plan during the Period of "Eleventh Five-year Plan"
    • 15.4.6 Business Diversification
  • 15.5 Fujian MingDong Electric Power Co. Ltd.
    • 15.5.1 Basic Situation
    • 15.5.2 Business Situation in Recent Three Years
    • 15.5.3 Plant Distribution and Power Resource Structure
    • 15.5.4 Analysis on Constructing and Planning Projects during 2007-2008
    • 15.5.5 Development Plan during the Period of "Eleventh Five-year Plan"
    • 15.5.6 Business Diversification
    • 15.6.1 Basic Situation
    • 15.6.2 Business Situation in Recent Three Years
    • 15.6.3 Plant Distribution and Power Resource Structure
    • 15.6.4 Analysis on Constructing and Planning Projects during 2007-2008
    • 15.6.5 Development Plan during the Period of "Eleventh Five-year Plan"
    • 15.6.6 Business Diversification
  • 15.7 Sichuan Xichang Electric Power Co. Ltd.
    • 15.7.1 Basic Situation
    • 15.7.2 Business Situation in Recent Three Years
    • 15.7.3 Plant Distribution and Power Resource Structure
    • 15.7.4 Analysis on Constructing and Planning Projects, 2007-2008
    • 15.7.5 Development Plan during the Period of "Eleventh Five-year Plan"
    • 15.7.6 Business Diversification
  • 15.8 SiChuan Ming Xing Electric Power Co. Ltd.
    • 15.8.1 Basic Situation
    • 15.8.2 Business Situation in Recent Three Years
    • 15.8.3 Plant Distribution and Power Resource Structure
    • 15.8.4 Analysis on Constructing and Planning Projects, 2007-2008
    • 15.8.5 Development Plan during the Period of "Eleventh Five-year Plan"
    • 15.8.6 Business Diversification
  • 15.9 Guangxi Guiguan Electric Power Co. Ltd.
    • 15.9.1 Basic Situation
    • 15.9.2 Business Situation in Recent Three Years
    • 15.9.3 Plant Distribution and Power Resource Structure
    • 15.9.4 Analysis on Constructing and Planning Projects, 2007-2008
    • 15.9.5 Development Plan during the Period of "Eleventh Five-year Plan"
    • 15.9.6 Business Diversification
  • 15.10 Guizhou Qianyuan Power Co. Ltd.
    • 15.10.1 Basic Situation
    • 15.10.2 Business Situation in Recent Three Years
    • 15.10.3 Plant Distribution and Power Resource Structure
    • 15.10.4 Analysis on Constructing and Planning Projects, 2007-2008
    • 15.10.5 Development Plan during the Period of "Eleventh Five-year Plan"
    • 15.10.6 Business Diversification

Section 16 Analysis on Price Competition for Hydropower in Power Market

  • 16.1 Analysis on Hydropower in Competitive Market
  • 16.2 Participants of Hydropower in the Market adhere to the Principle
  • 16.3 Coordination between Quotation Subject and Successful Bid Quantity
    • 16.3.1 Quotation of Cascade Station the main way
    • 16.3.2 Coordination of hydropower stations in the competitive market
  • 16.4 Treatment of Consumption Deviation Resulting from Inaccuracies in Hydrological Fo recast
    • 16.4.1 .Ideas for handling consumption deviation resulting from inaccuracies in hydrological forecast
    • 16.4.2 Treatment of waste water due to unsuccessful bidding in hydropower market

Section 17 Prospect & Forecast of China Hydropower Industry, 2007-2008

  • 17.1 Forecast of Economic Circle of Power Industry
  • 17.2 Forecast of Hydropower Installed Capacity
    • 17.2.1 By 2015, hydropower Installed Capacity in China will reach 150 million KW
    • 17.2.2 By 2020, China hydropower Installed Capacity will reach 250 million KW
  • 17.3 Prediction of Current Power Structure
  • 17.4 Prediction and Analysis on China' s Water Development

Section 18 Investment Risk & Suggestion of China Hydropower Industry, 2007-2008

  • 18.1 Analysis on Cost and Benefit of China' s Hydropower Industry
    • 18.1.1 Cost Analysis
    • 18.1.2 Benefit Analysis
  • 18.2 Analysis on Investment Opportunity and Risk
    • 18.2.1 Regional Limits and Policy Risk of Small Hydroelectric Projects
    • 18.2.2 Risk of Hydropowers dependence on rainfall and other natural conditions
    • 18.2.3 Risk of environmental restrictions
    • 18.2.4 Risk of the changes in Power supply and demand in the market
  • 18.3 Analysis on Regional Investment
    • 18.3.1 Changjiang River upstream
    • 18.3.2 All rivers in southwest China
    • 18.3.3 Yellow River Upper Reaches
    • 18.4.4 Investment Strategies

Charts

  • Chart 1 Reserves and Distribution of China' s Hydro-energy resources
  • Chart 2 Developable Hydro-energy resources in China
  • Chart 3 Twelve Hydropower Bases
  • Chart 4 Twelve Hydropower Bases in China
  • Chart 5 Depth of Main Rivers in Southeast Coast
  • Chart 6 Distribution and Utilization of Global Water Resources
  • Chart 7 Developable Energy in Technology in some countries
  • Chart 8 Dam and Hydropower in some countries, 2005
  • Chart 9 Number of Global Dams
  • Chart 10 Main Technological Parameters of Global Hydropower Development, 2005
  • Chart 11 Number and Loss of Enterprises above the scale, Feb-Dec 2006
  • Chart 12 Product of China' s Hydropower Industry, Feb-Dec 2006
  • Chart 13 Product Increasing trend, Feb-Dec 2006
  • Chart 14 Changes of Installed Capacity for years
  • Chart 15 Comparison between Hydropower and Thermal Power, Jan-Oct 2006 (Unit: 0.1 billion KWH)
  • Chart 16 Hydro Power Generation and Increase Trend for months, 2004-2006
  • Chart 17 Accumulative Increase of Hydro Power Generation for month during 2004-2006
  • Chart 18 Assets and Liabilities of Hydropower Industry, Feb-Dec 2006 Unit: Thousand Yuan
  • Chart 19 Cost and Expense of China' s Hydropower Industry, Feb-Dec 2006 Unit: Thousand Yuan
  • Chart 20 Profit making of Hydropower Industry, Feb-Dec 2006 Unit: Thousand Yuan
  • Chart 21 Main Economic Index of Hydropower Industry, Feb-Dec 2006 Unit: Thousand Yuan
  • Chart 22 Number of enterprises above the scale and their Loss of Hydropower Industry in Different Area, 2006
  • Chart 23 Liabilities of Hydropower Industry in Different Area, 2006 Unit: Thousand Yuan
  • Chart 24 Profit making of Hydropower Industry in different area, 2006 Unit: Thousand Yuan
  • Chart 25 Number of enterprises above the scale and their Loss of Hydropower Industry in Different ownership, 2006
  • Chart 26 Assets and Liabilities of different ownership enterprises of hydropower industry, 2006
  • Chart 27 Profit making situation of enterprises with different ownership in hydropower industry, 2006
  • Chart 28 Number of enterprises above the scale and loss in hydropower industry, 2006 Unit: Thousand Yuan
  • Chart 29 Liabilities of enterprises with different scale in hydropower industry, 2006 Unit: Thousand Yuan
  • Chart 30 Profit-making situation of enterprises with different scale in hydropower industry, 2006 Unit: Thousand Yuan
  • Chart 31 Forecast on the power consumption in China, 2002-2008
  • Chart 32 Status of 2006 China' s Thermal Power Industry (Unit: Thousand Yuan)
  • Chart 33 Project of Yueyang Nuclear Power Station
  • Chart 34 Accumulative generation and increase in the months, 2004-2006
  • Chart 35 Supply Structure of China' s Power, 2006
  • Chart 36 Cost of Thermal Power
  • Chart 37 Cost of Thermal power
  • Chart 38 Generation Cost of Hydropower
  • Chart 39 Generation Cost of Nuclear Power
  • Chart 40 Generation Cost of Wind Power
  • Chart 41 Cost of Wind Power
  • Chart 42 Decreasing Generation Cost of Wind Power Unit: euro cent/KWH
  • Chart 43 Generation Cost of Solar Power
  • Chart 44 Sales Revenue Increase of Transmission and Transformation Equipment, 2006
  • Chart 45 Forecast on Increase of Installed Capacity and Generation equipment during "Eleventh Five-year Plan"
  • Chart 46 Annual Changes of Hydropower Installed Capacity
  • Chart 47 Comparisons between the five generation groups, 2005
  • Chart 48 Sichuan water resources distribution
  • Chart 49 Analysis on market for Sichuan Power transferring to coastal provinces (ten thousand KW)
  • Chart 50 Constructing and Planning Projects in Sichuan
  • Chart 51 Hydropower Development of Main Rivers in Sichuan
  • Chart 52 Constructing and Planning Projects in Yunnan
  • Chart 53 Guizhou Constructing and Planning Hydropower Projects
  • Chart 54 Guangxi Constructing and Planning Hydropower Projects
  • Chart 55 Hubei Constructing and Planning Hydropower Projects
  • Chart 56 Hunan Constructing and Planning Hydropower Projects
  • Chart 57 Assets of China Yangtze Power Co., Ltd in 2006
  • Chart 58 Profit of China Yangtze Power Co., Ltd in 2006
  • Chart 59 Generation Power of Three Gorges Station and Gezhouba Station, 2006
  • Chart 60 Business Status of Chongqing Three Gorges Water Conservancy and Electric Power Co. Ltd., 2006
  • Chart 61 Business Status of Leshan Electric Power Co. Ltd., 2006
  • Chart 62 Business Structure of Leshan Electric Power Co. Ltd., 2006
  • Chart 63 Operating Status of Guangxi Guidong Electric Power Co. Ltd., 2006
  • Chart 64 Business Structure of Guangxi Guidong Electric Power Co. Ltd., 2006
  • Chart 65 Business Status of Fujian MingDong Electric Power Co. Ltd., 2006
  • Chart 66 Business Structure of Fujian MingDong Electric Power Co. Ltd., 2006
  • Chart 67 Operating Status of Qianjiang Water Resources Development Co. Ltd., 2006
  • Chart 68 Business Status of Sichuan Xichang Electric Power Co. Ltd., Jan-Sept 2006
  • Chart 69 Business Status of SiChuan Ming Xing Electric Power Co. Ltd., 2006
  • Chart 70 Business Structure of SiChuan Ming Xing Electric Power Co. Ltd., Jan-Sept 2006
  • Chart 71 Business Status of Guangxi Guiguan Electric Power Co. Ltd., 2006
  • Chart 72 Business Structure of Guangxi Guiguan Electric Power Co. Ltd., Jan-Sept 2006 Unit: Yuan
  • Chart 73 Business status of Guizhou Qianyuan Power Co. Ltd., 2006
  • Chart 74 Forecast of power source structure in the world, 1999-2020 Unit:1015Btu
  • Chart 75 Increasing Trend of Cost and Expense of China' s Hydropower Industry in 2006 (1)
  • Chart 76 Increasing Trend of Cost and Expense of China' s Hydropower Industry in 2006 (2)
  • Chart 77 Cost and Expense Contrast of Small, Middle and Large Size Enterprises of China' s Hydropower Industry
  • Chart 78 Main Economic Index of Hydropower Industry, 2006
- -
此出版品為英文撰寫

Top

[英文調查報告書]
中國水力發電產業及投資預測:2007年至2008年
2007-2008 Report on the Survey & Forecast of Investment Prospect of Hydropower Industry in China

出版商 : ChinaCCM.com ChinaCCM.com
代理商 : Global Information, Inc. Global Information, Inc.

US $ 1,800 (PDF by E-mail (Single User License))
商品編碼 : 52816

本頁所標示之售價為不含購買者所在地消費稅之未稅價格,相關消費稅金將另行加至交易金額中